LNGCON, 9-10 March 2026, Barcelona, Spain

Our Project Coordinator Pierre Bernard, Project Manager at ENGIE, presented the DelHyVEHR project at LNGCON 2026, held from 9-10 March in Barcelona. The congress brought together more than 390 key decision-makers from across the LNG value chain, including representatives from production and liquefaction, storage, transportation, trading, and regasification sectors. During a Roundtable Discussion on the […]
Deliverable 8.2 – Dissemination and Communication plan and updates M18

This plan presents the revised and updated version of Deliverable 8.1, to ensure the communication and dissemination activities remain relevant and effective as the DelHyVEHR project progresses. While building on the same overarching methodology as the first Dissemination and Communication Plan, it further refines target groups, communication channels, and key messages. Download Deliverable 8.2 here
Deliverable 7.7 – Regulations, Codes and Standards (RCS) Analysis – Preliminary report

This preliminary report analyses the current state of Regulations, Codes and Standards (RCS) applicable to safety of liquid hydrogen (LH₂) handling and fuelling in the context of the DelHyVEHR project. The findings reveal several regulatory gaps, especially in areas such as boil-off gas management, cryogenic pump design, purging procedures, and electrostatic discharge prevention. Although many […]
Deliverable 3.3 – Technical report on the flow meter technology for Boil-off gas and liquefied hydrogen

This technical report characterizes the potential technology of the flow meters that could be used in the DelHyVEHR demonstrator. There are two potential aspects – the liquefied flow meter for the main dispensing line and the boil-off gas (BoG) flow meter for the BoG line. The report establishes a realistic range of parameters that will […]
Deliverable 6.1 – Preliminary cost estimation of the LH₂ Bunkering Station for maritime and aviation business case

This Deliverable presents a preliminary techno-economic assessment of the DelHyVEHR bunkering station. The scope of the study focuses on a preliminary estimation of the investment required for the installation of the station, based on initial design of the system and its main equipment components. Overall, the results indicate that the cryogenic storage is the equipment […]
Deliverable 8.1 – Dissemination and Communication plan and updates M6
This Deliverable presents a plan outlining the key messages, target audiences, and communication channels used in the DelHyVEHR project. It is designed to ensure that the project’s results are widely shared and actively used to inform policy, drive industry adoption, and increase public understanding for hydrogen technologies. It is structured around the following Key Objectives: […]
Wind meets Gas 2025, 9-10 October 2025 in Groningen, Netherlands

From 9–10 October 2025, the DelHyVEHR team participated in the 9th edition of the Wind meets Gas Conference, hosted by the New Energy Coalition at the historic Martinikerk in Groningen, the Netherlands. The event brought together more than 500 professionals from industry, government, and academia to discuss the future of Europe’s energy transition — from […]
Gender Equality in Action: Insights from the DelHyVEHR Project

Measuring progress toward gender equality in hydrogen R&D As part of our ongoing commitment to gender equality in the DelHyVEHR project, we want to share recent insights from our project’s internal gender survey. Currently, 30% of our partners are women—a figure close to the EU average for researchers (34%), but still below their representation in […]
EU Hydrogen Week, 29 September-3 October 2025, Brussels, Belgium

This year, the DelHyVEHR project once again participated in the European Hydrogen Week Conference —one of Europe’s key events for the hydrogen community— held from 29 September to 3 October 2025 in Brussels. The event attracted over 1,200 participants, including policymakers, innovators, and representatives from all segments of the hydrogen value chain, who came together […]
DelHyVEHR Reaches Halfway Milestone at 18-Month General Assembly in Clermont-Ferrand

Clermont-Ferrand, July 16-17, 2025 – The DelHyVEHR consortium has gathered at Trelleborg’s facilities in Clermont-Ferrand for its 18-Month General Assembly – marking the halfway point in this ambitious project aimed at advancing liquid hydrogen (LH₂) refuelling technology for heavy-mobility applications. Over two days of intense discussions and presentations, partners showcased significant technical and strategic achievements […]