Deliverable 8.2 – Dissemination and Communication plan and updates M18

This plan presents the revised and updated version of Deliverable 8.1, to ensure the communication and dissemination activities remain relevant and effective as the DelHyVEHR project progresses. While building on the same overarching methodology as the first Dissemination and Communication Plan, it further refines target groups, communication channels, and key messages. Download Deliverable 8.2 here
Deliverable 7.7 – Regulations, Codes and Standards (RCS) Analysis – Preliminary report

This preliminary report analyses the current state of Regulations, Codes and Standards (RCS) applicable to safety of liquid hydrogen (LH₂) handling and fuelling in the context of the DelHyVEHR project. The findings reveal several regulatory gaps, especially in areas such as boil-off gas management, cryogenic pump design, purging procedures, and electrostatic discharge prevention. Although many […]
Deliverable 3.3 – Technical report on the flow meter technology for Boil-off gas and liquefied hydrogen

This technical report characterizes the potential technology of the flow meters that could be used in the DelHyVEHR demonstrator. There are two potential aspects – the liquefied flow meter for the main dispensing line and the boil-off gas (BoG) flow meter for the BoG line. The report establishes a realistic range of parameters that will […]
Deliverable 6.1 – Preliminary cost estimation of the LH₂ Bunkering Station for maritime and aviation business case

This Deliverable presents a preliminary techno-economic assessment of the DelHyVEHR bunkering station. The scope of the study focuses on a preliminary estimation of the investment required for the installation of the station, based on initial design of the system and its main equipment components. Overall, the results indicate that the cryogenic storage is the equipment […]
Deliverable 8.1 – Dissemination and Communication plan and updates M6
This Deliverable presents a plan outlining the key messages, target audiences, and communication channels used in the DelHyVEHR project. It is designed to ensure that the project’s results are widely shared and actively used to inform policy, drive industry adoption, and increase public understanding for hydrogen technologies. It is structured around the following Key Objectives: […]
DelHyVEHR Reaches Halfway Milestone at 18-Month General Assembly in Clermont-Ferrand

Clermont-Ferrand, July 16-17, 2025 – The DelHyVEHR consortium has gathered at Trelleborg’s facilities in Clermont-Ferrand for its 18-Month General Assembly – marking the halfway point in this ambitious project aimed at advancing liquid hydrogen (LH₂) refuelling technology for heavy-mobility applications. Over two days of intense discussions and presentations, partners showcased significant technical and strategic achievements […]
DelHyVEHR Partners Celebrate Milestones Achieved in First Year of Project

The DelHyVEHR project has successfully concluded its General Assembly hosted by Ulster University in Belfast. This event marks a significant milestone, celebrating one year since the project’s kick-off.
DelHyVEHR Project Poster

We gladly share that the DelHyVEHR project was showcased at EGATEC 2024 held from June 18-19 , 2024 in Hamburg.
Our project was one of the eight posters selected for presentation out of 40 at the European Gas Technology Conference.
This event brought together leading experts, industry stakeholders, and academic researchers to discuss
DelHyVEHR Press Kit

Please use the following Press Kit and its instructions for publications and information published regarding the DelHyVEHR Project.
DelHyVEHR – Kick-Off meeting in Paris on January 29th-30th

The DelHyVEHR project has officially kicked off its start with the goal to make liquid hydrogen distribution viable and therefore making it accessible as a clean energy carrier across various industries.